DailyIQ
DailyIQ
RIOTRiot Platforms Inc.

Earnings Release

Riot Platforms Inc.'s latest earnings press release, filed Nov 4, 2026, scored line by line for tone, guidance and what changed since the prior release.

No guidance given76 lines scoredFiled Nov 4, 2026SEC 8-K · Exhibit 99
Release Tone
60
BALANCED
GuidanceNo guidance givenWhat this release does to the company's outlook
Tone change▼ 3.6pointsvs the prior release (Aug 10, 2026)
Hedging language1.20per 100 words▲ 0.46 vs prior
New this quarter61of 76 linesWording that was not in the prior release

The lines that matter most

Ranked by how material, how strongly worded and how new each sentence is.

  1. 1

    “Together with our AMD contract and the lease signed with the same Frontier AI Lab at Rockdale earlier this year, Riot has contracted 1,151 megawatts and approximately $38 billion of data center revenue, which we expect will generate more than $2 billion of average annual net operating income at full deployment, firmly establishing Riot as a leading developer of large-scale digital infrastructure.

    New this quarter
  2. 2

    “Today, we are excited to announce the largest lease in Riot’s history: a 15-year triple-net powered land lease with a leading Frontier AI Lab for the entirety of our Corsicana campus, representing 910 megawatts of critical IT capacity and approximately $28 billion of contracted revenue over the initial term,” said Jason Les, CEO of Riot.

    New this quarter
  3. 3

    Riot has signed a 15-year triple-net powered land lease with a leading Frontier AI Lab for the entirety of the Company's Corsicana campus, covering 910 MW of critical IT capacity on a contiguous 332-acre parcel.

    New this quarter
  4. 4

    With total capital costs of approximately $6 million per IT megawatt, the Corsicana development will require about half the capital of a Tier 3 build while significantly limiting procurement, development, and ongoing operational risk to Riot.

    New this quarter
  5. 5

    Bitcoin Mining revenue of $116.0 million for the quarter, as compared to $160.8 million for the same three-month period in 2025, primarily driven by a lower average bitcoin price of $70,855, as compared to $114,361 in the prior-year period, partially offset by a 16% increase in production.

  6. 6

    The average cost to mine bitcoin, excluding depreciation, was $39,265 in the quarter, as compared to $46,324 per bitcoin in the same three-month period in 2025, driven by lower power costs and higher production, with $24.7 million of power curtailment credits, equivalent to $15,067 per bitcoin mined.

  7. 7

    Total revenue of $181.4 million, as compared to $180.2 million for the same three-month period in 2025, a 1% increase year-over-year as growth in Data Center and Engineering revenue offset lower Bitcoin Mining revenue.

  8. 8

    Engineering revenue of $47.0 million for the quarter, as compared to $19.1 million for the same three-month period in 2025, driven by strong third-party data center demand for custom electrical equipment.

Release by release

Tone and guidance for the last 3 earnings releases.

  1. Nov 4, 2026No guidance given59.5-3.6
  2. Aug 10, 2026New outlook issued63.2-13.6
  3. Apr 30, 2026No guidance given76.8

Bar length: tone on a 50–82 scale.

The release, annotated

1Highlight rankPositive toneNeutralNegative toneDimmed text: low materiality
Riot Platforms Reports Third Quarter 2026 Financial Results and Strategic Highlights
Executed a 15-year, 910 critical IT MW triple-net powered land lease with a leading Frontier AI Lab at Corsicana, representing approximately $28 billion in total contract value and approximately $1.8 billion in average annual rent over the initial term
Riot has now leased 1,151 MW of critical IT capacity, representing approximately $38 billion of long-term contracted revenue
Sold 20,264 bitcoin year-to-date for approximately $1.5 billion primarily to fund data center development; ended the quarter with $950.2 million in cash and bitcoin, and no equity raised in 2026
Quarterly revenue of $181.4 million, including $18.4 million of Data Center revenue
CASTLE ROCK, Colo., November 4, 2026 (GLOBE NEWSWIRE) - Riot Platforms, Inc. (NASDAQ: RIOT) (“Riot” or “the Company”), a vertically-integrated industry leader in digital infrastructure, specializing in the development and operation of large-scale data centers, reported financial results for the three-month period ended September 30, 2026.
The accompanying presentation materials are available on Riot’s website.
2“Today, we are excited to announce the largest lease in Riot’s history: a 15-year triple-net powered land lease with a leading Frontier AI Lab for the entirety of our Corsicana campus, representing 910 megawatts of critical IT capacity and approximately $28 billion of contracted revenue over the initial term,” said Jason Les, CEO of Riot.
1“Together with our AMD contract and the lease signed with the same Frontier AI Lab at Rockdale earlier this year, Riot has contracted 1,151 megawatts and approximately $38 billion of data center revenue, which we expect will generate more than $2 billion of average annual net operating income at full deployment, firmly establishing Riot as a leading developer of large-scale digital infrastructure.
“The structure of this new lease matters as much as the scale.
4With total capital costs of approximately $6 million per IT megawatt, the Corsicana development will require about half the capital of a Tier 3 build while significantly limiting procurement, development, and ongoing operational risk to Riot.
That lower capital requirement, combined with our strong balance sheet, means that we do not currently anticipate issuing equity to fund our announced projects.
“As these significant contracted cash flows come online, we will allocate our capital with discipline to whichever use creates the most value per share, whether that is our development pipeline or returning capital to shareholders.”
910 IT MW Powered Land Lease With a Leading Frontier AI Lab at Corsicana
3Riot has signed a 15-year triple-net powered land lease with a leading Frontier AI Lab for the entirety of the Company's Corsicana campus, covering 910 MW of critical IT capacity on a contiguous 332-acre parcel.
Capacity Leased: Leased the entirety of the Corsicana campus representing 910 MW of critical IT capacity.
Total Contract Value: Approximately $28 billion of total contract value and approximately $1.8 billion of average annual rent, including contractual escalators.
Approximately $54 billion if both five-year extension options are exercised.
NOI Contribution: Estimated NOI margin of approximately 99% under the triple-net structure, or approximately $1.8 billion of average annual net operating income over the initial term.
Capital Requirement: $6 million per IT MW, or $5.5 billion overall, approximately half the capital intensity of a typical Tier 3 build, implying an unlevered yield on cost of approximately 33%.
Riot will fund $2 million per IT MW for site work and electrical infrastructure, while the remaining $4 million per IT MW will be reimbursed to the tenant in phases, after each phase is delivered and paying rent.
Delivery Schedule: 400 MW in September 2027, 200 MW in January 2028 and 310 MW in July 2028, with rent on each phase commencing no later than 60 days after delivery of its powered pads.
Financing: Reimbursements to the tenant are expected to be funded with non-recourse project debt sized to contracted rent.
If financing on comparable market terms is not available, the tenant will directly fund the reimbursements, which will be recovered as a credit against rent over the remaining lease term.
Riot’s cash contribution is expected to be funded from existing liquidity, with no requirement to issue equity currently anticipated.
The lease is structured as a triple-net powered land lease, under which Riot delivers the land, the power infrastructure, and the powered pads, while continuing to own and maintain the high- and medium-voltage infrastructure that will serve them.
The tenant will procure, install, own, and operate the modular compute deployment on the powered pads and will bear substantially all operating costs, including power costs as a pass-through.
Rent is payable on the full 910 MW irrespective of utilization.
Third Quarter 2026 Financial and Operational Highlights
Key financial and operational highlights for the quarter include:
7Total revenue of $181.4 million, as compared to $180.2 million for the same three-month period in 2025, a 1% increase year-over-year as growth in Data Center and Engineering revenue offset lower Bitcoin Mining revenue.
Data Center revenue of $18.4 million for the quarter, comprised of $7.7 million in base rent, $0.5 million in variable lease revenue, and $10.2 million in tenant fit-out reimbursement revenue, reflecting the first full quarter of the stabilized 25 MW delivered to AMD.
5Bitcoin Mining revenue of $116.0 million for the quarter, as compared to $160.8 million for the same three-month period in 2025, primarily driven by a lower average bitcoin price of $70,855, as compared to $114,361 in the prior-year period, partially offset by a 16% increase in production.
Produced 1,637 bitcoin, as compared to 1,406 during the same three-month period in 2025.
6The average cost to mine bitcoin, excluding depreciation, was $39,265 in the quarter, as compared to $46,324 per bitcoin in the same three-month period in 2025, driven by lower power costs and higher production, with $24.7 million of power curtailment credits, equivalent to $15,067 per bitcoin mined.
8Engineering revenue of $47.0 million for the quarter, as compared to $19.1 million for the same three-month period in 2025, driven by strong third-party data center demand for custom electrical equipment.
Ended the quarter with $950.2 million in cash and bitcoin, including $748.2 million in cash, of which $79.2 million is restricted, and 2,418 bitcoin, equating to approximately $202.0 million based on the market price for one bitcoin on September 30, 2026 of $83,554.
During the first nine months of 2026, the Company sold 20,264 bitcoin for proceeds of approximately $1.5 billion, primarily to fund data center development, and repaid in full and terminated its $200 million Coinbase credit facility, releasing all pledged bitcoin.
Please use this link here to register.
For both dial in numbers, the audience passcode is 1817052.
Riot Platforms, Inc. (NASDAQ: RIOT) is a leading digital infrastructure company, specializing in the development and operation of large-scale data centers.
The Company operates digital infrastructure and bitcoin mining facilities in central Texas and Kentucky, and engineering and fabrication facilities in Denver and Houston.
Riot’s vision is to be the world’s most trusted platform for powering and building the next digital world.
Its mission is to empower the future of digital infrastructure by positively impacting the sectors, networks, and communities the Company touches.
For more information, visit Riot Platforms .
Words such as “anticipates,” “believes,” “plans,” “expects,” “intends,” “will,” “potential,” “hope,” similar expressions and their negatives are
Additional Information and Communications
For important news and information regarding the Company, including presentations and other news and events, visit the Investor Relations section of the Company’s website, riotplatforms.com/investors, and the Company’s social media accounts, including on X and LinkedIn.
Contacts:
Non-U.S. GAAP Measures of Financial Performance
In addition to financial measures presented under generally accepted accounting principles in the United States of America (“GAAP”), we consistently evaluate our use of and calculation of non-GAAP financial measures such as “Adjusted EBITDA.” EBITDA is computed as net income before interest, taxes, depreciation, and amortization.
Adjusted EBITDA is a performance measure defined as EBITDA, adjusted to eliminate the effects of certain non-cash and/or non-recurring items that do not reflect our ongoing strategic business operations, which management believes results in a performance measurement that represents a key indicator of the Company’s core business operations.
The adjustments include fair value adjustments such as derivative power contract adjustments, equity securities fair value changes, and non-cash stock-based compensation expense, in addition to financing and legacy business income and expense items.
We believe Adjusted EBITDA can be an important financial performance measure because it allows management, investors, and our board of directors to evaluate and compare our operating results, including our return on capital and operating efficiencies from period-to-period by making such adjustments.
Additionally, Adjusted EBITDA is used as a performance metric for share-based compensation.
Adjusted EBITDA is provided in addition to, and should not be considered a substitute for, or superior to, net income, the most comparable measure under GAAP to Adjusted EBITDA.
Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, diluted net income per share or any other performance measure derived in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity.
Adjusted EBITDA has limitations as an analytical tool, and you should not consider this financial measure either in isolation or as a substitute for analyzing our results as reported under GAAP.
The following table reconciles Adjusted EBITDA to Net income (loss), the most comparable GAAP financial measure:
The Company defines Cost to Mine as the cost to mine one bitcoin, excluding bitcoin miner depreciation, as calculated in the table below.
(1)Other direct cost of revenue includes compensation, insurance, repairs, and ground lease rent and related property tax.
(2)For the three months ended September 30, 2026 and 2025, we paid cash of $6.8 million and $60.2 million, respectively, and for the nine months ended September 30, 2026 and 2025, we paid cash of $55.5 million and $152.4 million, respectively, in total deposits and payments for the purchase of miners.
Costs to finance the purchase of miners were zero in all periods presented as the miners were paid for with cash from the Company’s cash balance.
The seller did not provide any financing, nor did the Company borrow from a third party to purchase the miners.
(3)Power curtailment credits are credited against our power invoices as a result of temporarily pausing our operations and reselling power under our PPAs and participating in ERCOT’s and MISO’s Demand Response Service Programs.
Our fixed-price power purchase contracts enable us to strategically curtail our mining operations and participate in these programs, which significantly lower our cost to mine bitcoin.
These credits are recognized in Power curtailment credits on our Condensed Consolidated Statements of Operations, outside of cost of revenue, but significantly reduce our overall cost to mine bitcoin.
(4)We capitalize the acquisition cost of our miners and include these costs in Property and equipment, net on our Condensed Consolidated Balance Sheets.
The miners are depreciated over an estimated useful life of three years, during which time, they are expected to contribute to the generation of bitcoin revenue.
We do not consider
depreciation expense in determining whether it is economical to operate our miners because depreciation is a non-cash expense and is not a variable operating cost that can be avoided even if we curtail operations temporarily.
Depreciation expense incurred is disclosed for each respective period in the table above.
(5)The following table presents the future depreciation expense of all of our bitcoin miners:
Remainder of 2026​$67,749
Total​$419,267
(6)Computed as revenue recognized from bitcoin mined divided by the quantity of bitcoin mined during the same period.
20 boilerplate lines (safe-harbor disclaimer, contacts, call details) are set aside.

How this is scored

  • Source: the press release Riot Platforms Inc. filed with the SEC as Exhibit 99 to Form 8-K (Item 2.02). Financial statements and boilerplate are set aside.
  • Tone: a financial sentiment model scores each sentence 0 to 100; the release score weights sentences by how material they are.
  • Materiality and guidance: a classifier judges whether each sentence is specific information, and what the release does to the outlook.
  • New this quarter: wording that does not appear in the prior release.
  • Hedging: uncertainty words (may, could, approximately, headwinds and similar) per 100 words of narrative.

These scores describe the release's language. They are not a forecast or a recommendation. Read the original filing

Back to RIOT overview